Project
Energy City Bolsward

The municipality of Súdwest-Fryslân has asked Deelrijk for managing the realization of a hydrogen consortium in the municipality. The goal is to implement green hydrogen production (electrolyzer), storage, and distribution in and around Bolsward.

The associated activities include (but are not limited to):
– Research and establishment of a legal entity consortium (laws and regulations)
– Research and establishment of a financial entity consortium (business case)
– Conducting business development for the consortium and the hydrogen hub
– Support for Public Affairs
– Support for engineering and system choice/distribution
– Identifying and creating prerequisites to make the location suitable

Goals
With Energy City Bolsward, we work towards various national and European goals.
National goals:
– 50 publicly accessible hydrogen refueling stations by 2025.
– 500 MW of installed electrolysis capacity by 2025.
– Scaling up to 3-4 gigawatts of electrolysis capacity by 2030.

European goals:
– 6 GW of electrolysis capacity in Europe by 2024.
– 40 GW of electrolysis capacity in Europe

Want to know more?

projecten

Wij initiëren, begeleiden en realiseren waterstofprojecten.
Met onze partners ontwikkelen en realiseren wij groene waterstofproductielocaties, waterstofopslag- en transportsystemen, en zijn wij betrokken bij de totstandkoming van waterstoftankstations (HRS).


|)) deelrijk ziet het omzetten van duurzame elektrische energie in transporteerbaar hoogwaardig gas als een belangrijke manier om een bijdrage te leveren aan de energietransitie.

opdrachtgevers

Image
Image
Image
Image
Image
Image